ThermaBlok®
Installation Methods
Thermablok
Thermal Strip Insulation
Thermablok may be installed either on the exterior or
interior side of the wall framing. Insulate the full length of
framing members. Apply to all wall, floor or ceiling framing
edges: headers, footers, trusses, window and door frames, floor
joist and roof rafters.
It is suggested that Thermablok be applied to the
exterior side
of the assembly, if:
- You have access to entire building envelope, between
floor
joists and other areas not accessible from the inside.
- With metal framing you are able to create a warm
stud,
preventing condensation.
Cut and fit Thermablok 1-1/2" wide encapsulated strips
tight to
any protrusions or interruptions to the insulation plane. Butt
edges and ends of Thermablok thermal bridging barrier insulation
tightly to each other without gaps.
Remove release backing from adhesive tape on Thermablok
thermal bridging barrier insulation, and apply directly to either
metal or wood framing. For wood framing you may use a staple
hammer with applicable length staples.
Immediately following application of self-adhering
Thermablok, press thermal bridging barrier strip firmly and
uniformly to substrate surfaces to insure adhesion.
Install covering materials wall, roof, sheathing,
plaster
lathe or gypsum wallboard in accordance with guidelines.
Plan and Coordinate the Thermablok aerogel insulation
work to minimize the generation of off-cuts and waste. Reuse Thermablok
off-cuts to the maximum extent possible.
Do not install self-adhering Thermablok thermal bridging
barrier insulation when temperature or weather conditions are
detrimental to successful installation.
Thermablok non-encapsulated strips (aerogel composite
material without polymer wrapping) attaches with an appropriate
construction grade adhesive per the adhesive manufacturer’s
instructions, or with any appropriate substrate fastener. Observe
handling precautions per MSDS.
Thermablok
Blanket Insulation Installation
Do not install Thermablok and new siding over walls that
have
deteriorated from moisture, insects, etc. Repair unsound walls
prior to proceeding.
Plan and coordinate the thermal bridging barrier
insulation
work to minimize the generation of off-cuts and waste. Reuse
Thermablok blanket material cuts to the maximum extent feasible.
Precut lengths in work staging area. Thermablok may be
cut
with scissors, hot knife, or utility knife. Observe handling
precautions per MSDS.
Attach Thermablok with an appropriate construction grade
adhesive following the adhesive manufacturer’s
instructions.
As an alternative to adhesive, appropriate masonry or
sheathing fasteners equipped with 1" (25mm) dia. mushroom caps;
spaced 12" (30.5cm) to 16" (40 cm) in any direction, can be
used to attach the Thermablok to the masonry.
Take care to insure the edges of adjacent sections of
Thermablok are tightly butted together.
Cut Thermablok to fit tightly around windows and doors.
Cut
flush to edge of framing.
Beneath radiant heat floor systems and basement floor to
increase thermal efficiency. Simply roll out and spot tack
material into place.
Read before
Installation
Thermablok can be cut using conventional textile cutting
tools
including scissors, electric scissors, and razor knives. The
material can be dusty, and it is recommended gloves, safety
glasses, and dust mask be worn when handling material.
Download MSDS [PDF]
for complete health and safety information. Long sleeved, long legged
work clothes that cover any exposed skin are recommended when handling
the blanket material which is not encased in the plastic sleeve.
Plan and Coordinate the thermal bridging barrier
insulation work
to minimize the generation of off-cuts and waste. Reuse thermal
bridging barrier off-cuts to the maximum extent possible.
|